Last updated: 2026-05-26 (v0.24 Track D slice). Companion: COMMENT_WINDOWS.md — the authoritative source for window dates and the policy text. This file is the live status view that an integrator (or external reviewer) opens to see, at a glance:

  • Which windows are open, on what day they close, and how many days remain as of today.
  • For each RFC: what's already been shipped in v0.13..v0.23 that reduces (or moots) the RFC's open question.
  • Which RFCs are still pending user action — i.e. the GitHub Discussion thread has not been opened, or the close-out disposition has not been recorded.
  • The single number a viewer cares about: the day v1.0 can be tagged (max close-date across all open windows, assuming no re-opens).

Today's date for the countdown is 2026-05-26. All eight windows opened on 2026-05-26 (see COMMENT_WINDOWS.md ## Changelog), so every "Days remaining" cell below is the window duration minus zero. Refresh Today and the per-row deltas on each new slice.

Top-line gauge

Metric Value
Total RFCs in the v1.0 freeze gate 8
Windows currently Open 8
Windows Closed (accept / reject) 0
Windows pending Modify and re-open 0
Windows blocked on Pending User Action (Discussion thread not opened or close-out not recorded) see notes below
Earliest close 2026-06-09 (RFC-005)
Latest close (== earliest v1.0 tag day) 2026-07-25 (RFC-002, RFC-006)
Earliest possible v1.0.0 tag 2026-07-26

Pending User Action note. Each row's "Pending User Action" flag covers one or both of:

  • Thread open — has the integrator created the discussions/categories/rfcs thread referenced by COMMENT_WINDOWS §1 and posted the RFC announcement? (Inferred today from whether the thread URL resolves. As of 2026-05-26, all 8 threads are flagged Pending — the v0.19 slice shipped the infrastructure but the user has not yet driven the Discussions side.)
  • Close-out recorded — for windows that have already passed their close date, has the integrator written dev/history/notes/RFC_DISPOSITION_<RFC>.md? No window is past its close date as of 2026-05-26, so this column is N/A for every row.

Per-RFC status (sorted by close date)

RFC Title Window Opened Closes Days left Implementation status (v0.13..v0.23 work) Feedback thread Disposition Pending User Action
RFC-005 Affinity frontend syntax 14 days 2026-05-26 2026-06-09 14 A102 runtime API frozen v0.6; surface syntax NOT YET shipped (still reserved-but-not-parsed). RFC remains forward-looking. open (pending) Open thread
RFC-001 First-class union ADTs 30 days 2026-05-26 2026-06-25 30 A11 sentinel lowering still in force in v1.0. RFC is forward-looking; nothing landed pre-empts it. open (pending) Open thread
RFC-003 Sandboxed proc-macro execution 30 days 2026-05-26 2026-06-25 30 A94 parse + purity check still the v1.0 contract; MT6005/MT6006 active. No sandbox executor pre-built. RFC is forward-looking. open (pending) Open thread
RFC-004 Per-call FsCap manifest 30 days 2026-05-26 2026-06-25 30 A100/A109 process-wide default still the v1.0 contract. RFC remains forward-looking. open (pending) Open thread
RFC-008 Effect rows 30 days 2026-05-26 2026-06-25 30 SHIPPED v0.13..v0.19HirEffectRow::Open(Vec<HirRowVar>), multi-row tail parsing, MT4055..MT4059 active. The window now closes the process (was there reviewer pushback?) rather than the design. open (pending) Open thread; spec text already absorbed into v1.0-RC4 §9.2
RFC-009 Set-of-scopes macro hygiene 30 days 2026-05-26 2026-06-25 30 SHIPPED v0.13..v0.15mty-macros scopes.rs/hygiene.rs/expand.rs, scope-aware resolver wired into HIR. The RFC itself carries Status: Accepted (v0.13). open (pending — ratify) Open thread; close-out is "ratify accepted"
RFC-002 WASM Component Model wrapper 60 days 2026-05-26 2026-07-25 60 A47/A97 core-module-only still the v1.0 contract. RFC remains forward-looking (canonical-ABI return bridge, wit-component wrap). open (pending) Open thread
RFC-006 Lossless live agent migration 60 days 2026-05-26 2026-07-25 60 SHIPPED v0.21 (Tier 4.3)MigrationOrchestrator::migrate_agent, SnapshotSource/SnapshotSink/mesh wire hooks, 6 MB cap, PlacementPolicy trait + 3 bundled policies, [cluster.placement] manifest block, OTel cluster metrics, MT507x band. RFC header already updated to "IMPLEMENTED in v0.21". open (pending — ratify) Open thread; close-out is "ratify shipped"

Notes on already-shipped RFCs. RFC-006, RFC-008, and RFC-009 are coded against in production but their public comment window still has to run — the freeze policy in COMMENT_WINDOWS.md §3 requires every RFC to complete a window before v1.0 tag, even if the design is already proven through implementation. The dispositions for these three will almost certainly be accept (ratifying the shipped behaviour), but reviewers may surface bugs / suggest refinements that we'd have to absorb as point patches in v1.0-PATCH1 or v1.1-MINOR1.

Day-count visualisation

2026-05-26          2026-06-09          2026-06-25          2026-07-25
 |                   |                   |                   |
 Open (8 windows)    RFC-005 closes      RFC-001/003/004/    RFC-002/006 close
                     (14-day track)      008/009 close       (60-day track)
                                         (30-day track)
                                                              \
                                                               v1.0.0 earliest = 2026-07-26

Per-RFC implementation cross-reference (deep dive)

This table feeds the per-RFC "Implementation Status" section that each RFC file now carries. The dashboard cell above is the short form; this is the verbose form.

RFC Slices that touched it Pre-window status
RFC-001 none in v0.13..v0.23 Forward-looking. A11 sentinel Result[T, Error] remains v1.0 contract; first-class union ADTs are a v1.1 promotion.
RFC-002 none in v0.13..v0.23 Forward-looking. Core-Wasm-modules ship in v1.0 via wasm-encoder; wit-component wrap + canonical-ABI return bridge are v1.1 promotions.
RFC-003 v0.13 stubbed sandbox Mostly forward-looking. MT6005 (impurity) + MT6006 (call-site gate) are the v1.0 contract; sandboxed execution is the v1.1 promotion. Some scaffolding for the eventual sandbox lives in mty-macros::proc constants but no executor.
RFC-004 none in v0.13..v0.23 Forward-looking. A100 process-wide-default FsCap remains the v1.0 contract; per-call manifest threading is the v1.1 promotion.
RFC-005 none in v0.13..v0.23 Forward-looking. Affinity::Sticky/Elastic runtime API frozen v0.6; surface syntax agent X with affinity = sticky is reserved-but-not-parsed.
RFC-006 v0.18..v0.21 Implemented. v0.18 cluster transport (AgentAddr = node:type:pid + framed CBOR-over-TLS); v0.19 routing + MT5032 peer-disconnect fan-out; v0.20 mTLS + Tier 4.2 ClusterSupervisor; v0.21 Tier 4.3 MigrationOrchestrator + snapshot wire variants + PlacementPolicy + manifest block + OTel cluster metrics + MT507x diagnostic band. RFC header already carries Status: IMPLEMENTED in v0.21.
RFC-008 v0.13..v0.19 Implemented. v0.13 row variables landed in mty-hir / mty-types. v0.18 parser absorbed multi-row-variable tail (!{| E1, E2} / effect a, b | E1, E2); spec went RC3 → RC4 to admit the new grammar (see v1.0-rc.md §9.2). v0.19 finished HIR multi-row lowering (every EFFECT_ROW_VAR child read). MT4055..MT4059 all active emit.
RFC-009 v0.13..v0.15 Implemented and Accepted. mty-macros::scopes / hygiene / expand, scope-aware resolver into HIR, expand_scoped entry point. RFC file carries Status: Accepted (v0.13). The comment window is procedural ratification.

How this dashboard stays accurate

  • Per-slice maintenance. Every slice that touches RFC-adjacent code refreshes this file's per-RFC row and the in-file Implementation Status section in the matching RFC.
  • Per-day countdown. "Days left" can be recomputed by hand from (close - today) in whole days; no script wires this yet (a scripts/refresh-rfc-dashboard.py is a v1.0-RC follow-up).
  • Disposition snapshot. When a window closes, the integrator (a) writes dev/history/notes/RFC_DISPOSITION_<RFC>.md, (b) updates the Status: header line in the RFC file itself, and (c) flips this table's Disposition column.
  • Companion files. This dashboard is not the source of truth for window opening dates — that's COMMENT_WINDOWS.md. Conflicts resolve in favour of COMMENT_WINDOWS.md (the policy doc).

Changelog

  • 2026-05-26 — initial dashboard authored as part of v0.24 Track D. All 8 windows recorded as open; 3 RFCs (006, 008, 009) flagged as already-implemented and awaiting procedural close-out.